Scheduled Maintenance Technical Publication app - My Email Notifications feature will undergo some optimization activities over the week; during that time users may receive false positive notifications or duplicated emails. We appreciate your patience as we strive to enhance the Aero portal experience.
Scheduled Maintenance We will be conducting scheduled maintenance on 4/19 from 10:00 PM EST to 4/20 9:00 PM EST. During this time MyAerospace applications will be temporarily unavailable. We apologize for any inconvenience this may cause.​​
×

Your browser is not supported.

For the best experience, please access this site using the latest version of the following browsers:

Close This Window

By closing this window you acknowledge that your experience on this website may be degraded.

ADS-B Upgrades Keep Canadian Operator Flying in the U.S.

ADS-B Upgrades Keep Canadian Operator Flying in the U.S.

Estimates indicate that up to 25% of eligible aircraft will fail to get their FAA-mandated ADS-B upgrades by the January 1, 2020 deadline, forcing them out of U.S. airspace. By coordinating with Honeywell’s service department, most avionics completion facilities can still be able to return upgraded aircraft in about two weeks.

One Quebec-based operator, with 85% of its flights going into the U.S., decided to upgrade early before a strain on the supply chain makes it harder to equip their aircraft. Working with its go-to avionics completion facility, Mid-Canada Mod Center (MCMC), the Canadian operator started upgrading its fleet of Learjet 45s in 2017.

“We’ve had no problems with our new ADS-B,” says Marc Mainville, the operator’s Director of Maintenance, who’s impressed with the reliability of the equipment and the dispatching. “The boxes modified by Honeywell are top-notch. If you do what they say and follow the service bulletins, you’ll never miss a flight due to a piece of Honeywell equipment.”

The Canadian operator’s decision to purchase a Honeywell Avionics Protection Plan (HAPP) has also proven to be extremely beneficial during the ADS-B upgrade process. Because any necessary service bulletin work was already pre-approved and covered free of charge, Mainville didn’t have to endure any scheduling delays or additional billing. “Everything just went in and came back out in two weeks, and that was it,” he says.

Looking back on the entire ADS-B process, Mainville says that he’s glad the bulk of the upgrades are behind him. He knows that other operators will be forced to deal with delays and grounded aircraft if they wait too much longer to schedule their ADS-B equipment upgrades. “By doing our ADS-B upgrades early and working with Honeywell and our friends at Mid-Canada Mod Center, we now enjoy the peace of mind that comes from knowing we can fly freely, wherever our clients need to go.”

“ We didn’t want to delay the ADS-B upgrade. If left undone, it could seriously hinder our business and limit our flying to Canadian airspace." -Marc Mainville, Director of Maintenance

Related Downloads

Cas Studies  (1)
Cas Studies  (1)
Size
ADS-B Upgrades Keep Canadian Operator Flying in the U.S. Case Study
Size
5.18MB
Download File Multiple Download been Selected
Snapshots  (1)
Snapshots  (1)
Size
ADS-B Upgrades Keep Canadian Operator Flying in the U.S. Snapshot
Size
2.73MB
Download File Multiple Download been Selected
To know more about the ADS-B and schedule your upgrade, just fill out the form!