-
Location
-
North America
-
Latin America
-
Asia Pacific
- |
- Sales & Service Partners
- |
- Contact Us
- |
-
Select Shopping Cart Account
Choose the account number for your parts ordering shopping cart. Your current cart will be saved when switching accounts.
Account# Account Name City Zip/Post Code My Account
You are browsing the product catalog for
Your browser is not supported.
For the best experience, please access this site using the latest version of the following browsers:
By closing this window you acknowledge that your experience on this website may be degraded.
1,000 Reasons to Celebrate Honeywell’s T55 Engine
February 14, 2018
Honeywell and the U.S. Army passed a major milestone in January when they completed the overhaul of the 1,000th T55 engine at the Corpus Christi Army Depot in Texas. A pair of the Honeywell engines power the CH-47 Chinook helicopter, a mainstay of the Army’s fleet and the only heavy-duty helicopter the service flies.
Under the program, worn parts are replaced in the T55 engines to restore the engine to like-new condition and return it to service. The overhaul is less than half the cost of replacing the engine and the Army has saved more than $36 million so far.
“This has been an extremely successful program that shows the power of government-industry partnership,” said Rod Hynes, Sr. Director of Army Programs at Honeywell. “The Army, Honeywell and KBRwyle work extremely well together to extend the life of this great helicopter that is so critical to achieving the Army’s mission and supporting warfighters in the field.”
The overhaul program began in 2005 and the first T55 was overhauled at Corpus Christi in 2006, according to Program Manager Mike Boies. “That engine is still flying on a C-47 based at Ft. Hood in Texas,” he said. “It’s extremely gratifying to everyone on the Honeywell-KBRwyle Corpus Christi team to know we are making a difference and meeting the Army’s needs.”
Quality and program performance are priorities for the team, which has enabled the depot to be ranked 100 percent capable for all engine overhaul process and achieve 100 percent on-time delivery for nine years.
Plans call for about 45 engines to be overhauled at the depot this year. Each overhaul takes 120-200 days, depending on the condition of the engine when it comes into the depot. The team overhauled about 100 engines each year at the program’s peak, during Operation Enduring Freedom and Operation Iraqi Freedom.
The Chinook is considered the workhorse of the Army fleet. It carries both troops and supplies and supports a full spectrum of operations including disaster relief, homeland defense and security, and overseas contingency operations.
Honeywell has produced more than 6,000 T55 engines, which have logged more than 12 million hours of operation on the CH47 and MH47 helicopters.
Our Engines & Power Systems business unit is looking for talented Engineers passionate about the design, development, validation and certification of advanced turbomachinery products for commercial and defense applications. We are hiring across all Engineering departments and experience levels. Check out the link below to become a #futureshaper. #aerospace #hiring
Sign up to receive exclusive marketing e-communications including updates about our product offerings, special offers, news, and events.
Copyright © 2024 Honeywell International Inc.
Maximum File Size
Maximum Files Exceeded
Due to inactivity you will be logged out in 000 seconds.
Maximum File Size
Maximum Files Exceeded
Your documents are ready for you. Please click here to open.
Maximum File Size
Maximum Files Exceeded
There is an issue with invoices zip file download. Please go back and try again later. Thanks!
Maximum File Size
Maximum Files Exceeded
Your orders excel is ready for download. Please click here to download.
Maximum File Size
Maximum Files Exceeded
There is an issue with orders excel file download. Please go back and try again later. Thanks!